Government SchemesHow to Claim PM Surya Ghar Subsidy in 2025: Step-by-Step Guide
Complete breakdown of eligibility, portal registration, bank link verification, and inspection checklist.

Save up to 90% on electricity bills with government subsidy under PM Surya Ghar Muft Bijli Yojana.

Save up to 90% on electricity bills with government subsidy under PM Surya Ghar Muft Bijli Yojana.
Our Technical Engineer will visit your site and guide you with the best solar solution.
From residential rooftops to sprawling industrial parks, we handle the complete lifecycle: engineering, procurement, net metering, subsidy filing, and 25-year maintenance.

Homeowners can avail of financial assistance from the Central Government for installing rooftop solar. Our team handles the complete process from start to finish.
Suited for apartments and light energy needs
A balanced choice for regular family use
Built for higher energy consumption
We treat solar not as a retail transaction, but as a long-term critical power plant installed on your private property.
Exclusively ALMM-listed high-density half-cut monocrystalline modules delivering 21.8%+ peak efficiency even in 48°C extreme summer heat.
Full liaisoning with DISCOM engineers for sanction load approvals, bidirectional solar meter procurement, and fast synchronisation.
Insured output guarantee certifying minimum 84.8% power yield even after 25 continuous years of operation under harsh weather.
Track daily kilowatt-hours produced, units exported to grid, CO₂ avoided, and real-time inverter health live from your smartphone.
A predictable, hassle-free process completed within 14 working days. Our in-house engineering team handles every single milestone with zero hidden surprises.
Comprehensive on-site shadow analysis to compute optimal tilt and azimuth angle.
Wind-resistant structural design & transparent BOM quotation.
PM Surya Ghar registration and DISCOM load feasibility approval.
Rapid 3-day installation with hot-dip galvanized mounting structures.
Bi-directional meter installation, grid activation, and subsidy DBT trigger.
Comprehensive on-site shadow analysis to compute optimal tilt and azimuth angle.
Wind-resistant structural design & transparent BOM quotation.
PM Surya Ghar registration and DISCOM load feasibility approval.
Rapid 3-day installation with hot-dip galvanized mounting structures.
Bi-directional meter installation, grid activation, and subsidy DBT trigger.
High-yield engineering delivered on time, within budget, and built to withstand harsh climate conditions.
Turnkey high-tension solar infrastructure powering round-the-clock spinning machinery at the Vardhman Textiles campus. The 2.5 MWp captive plant was engineered around the factory's three-shift load profile, with string-level monitoring and HT protection coordinated with the existing 33 kV substation. Installation was phased to avoid production downtime, and the system now offsets a significant share of grid consumption every month. Annual generation and savings are tracked through a dedicated operations dashboard.

Hospital director explains how Anirudh Solar's hybrid BESS solved critical ICU power fluctuations while slashing power costs by 68%. The system combines an 85 kWp rooftop array with lithium-ion storage and automatic changeover, keeping operation theatres and intensive-care wards protected during grid disturbances. Commissioning included detailed load studies, safety isolation, and coordination with the hospital's existing DG backup. The plant is monitored remotely so the facility team can track generation and battery health in real time.

Custom elevated architectural pergola preserving complete terrace usability for family gatherings while generating 24 kWh daily. The 5.4 kWp mono PERC array is mounted on a slim-line structure that keeps headroom below and shade-free panel spacing above. Anirudh Solar handled structural design, JVVNL net-metering, and the PM Surya Ghar subsidy application end to end. The family now runs air conditioners and appliances through the day on solar, with surplus units exported to the grid.

Zero-export grid synchronization with HT DG synchronization preventing reverse power flow during grid outages. The 350 kWp grid-tied plant serves lecture halls, laboratories, hostels, and administrative blocks across the campus. Anirudh Solar engineered string-level monitoring, anti-islanding protection, and automated export limiting to satisfy DISCOM safety requirements. The system reduces daytime demand charges and gives the campus a predictable energy cost for the next two decades.

Hear how an independent Jaipur duplex slashed monthly electricity bills from ₹18,500 to near-zero with tier-1 bifacial panels. The 10 kWp system was designed around the family's evening-heavy consumption pattern and paired with a hybrid inverter for backup readiness. Anirudh Solar completed the rooftop structure, wiring, JVVNL net-metering, and PM Surya Ghar documentation within the promised timeline. The homeowner now tracks daily generation and savings through a mobile monitoring portal.

High-surge industrial inverter system customized for refrigeration compressors with real-time cloud SCADA monitoring. The 650 kWp captive plant stabilises power for cold-chain operations where even brief voltage dips can damage stored produce. Anirudh Solar designed active harmonic filtering, remote fault alerts, and a maintenance schedule around the facility's 24/7 load profile. The system delivers measurable energy savings while supporting the company's sustainability and compliance reporting.

Clear guides on subsidies, panel technology, and DISCOM net-metering regulations.

Schedule a complimentary on-site engineering survey today with our Chief Technical Engineer. Get an exact rooftop CAD blueprint and PM Surya Ghar subsidy approval within 48 hours.







Enter your monthly electricity bill to get an estimated system size, cost and savings under PM Surya Ghar Muft Bijli Yojana.
Get a quick estimate for your home or business.